GP Bluestone completed a staged streetscape upgrade along Tramoo Street, delivering road, drainage, paving, accessibility and landscape improvements with a strong focus on safety, coordination and quality delivery.

Project: Tramoo Street Streetscape Upgrade – Lalor

Client: City of Whittlesea

Work Description:

GP Bluestone was engaged by the City of Whittlesea to deliver streetscape upgrades along Tramoo Street in Lalor. The scope focused on revitalising the public space through a combination of civil, drainage and landscape works, while improving accessibility, safety, and pedestrian amenity.

Works commenced with extensive demolition, including the removal of existing kerbs, footpaths, road pavements, vehicle crossings, signage, street furniture, and underground drainage assets. The drainage scope involved the installation and modification of side entry pits, grated pits, junction pits, and trench grates, along with RCP stormwater and agricultural drains with its integration into the existing drainage system.

Road pavement works included the reconstruction of base and wearing courses using VicRoads-approved asphalt materials, profiling works, and raised bluestone/asphalt pavements at intersections. Reinforced concrete paving was constructed throughout, including coloured and patterned finishes, new pram crossings, and footpaths.

Street furniture upgrades included outdoor bench seats, signage (regulatory and advisory), Linemarking using long-life thermoplastics, and the installation of pedestrian asphalt pavements and tactile ground surface indicators. Services such as Telstra pits, water valves, hydrants, and signal infrastructure were adjusted to suit new surface levels.

Soft landscaping works were completed in coordination with the civil scope, including batters, topsoil installation, and site clean-up.

This project demonstrates GP Bluestone’s capability to deliver integrated streetscape, and infrastructure works within an operational urban environment, with a strong focus on safety, stakeholder communication, and quality delivery.

29 May 2026
Project: MARIBYRNONG RIVER TRAIL
29 May 2026
Project: WINN GROVE STREET ROAD RECONSTRUCTION
29 May 2026
Project: ROAD RECONSTRUCTION
29 May 2026
Project: BLACKBURN SOUTH DRAINAGE IMPROVEMENT
29 May 2026
Reconstructing Tyson Street for Safer Local Access
29 May 2026
Revitalising Alexander Avenue for Community Use
by Domagoj Dedic 29 May 2026
Smarter Tree Surrounds for Greener Streets
29 May 2026
Local Road Renewal in Murrumbeena
29 May 2026
Turning an Underused Street Corner into Community Space
by Domagoj Dedic 29 May 2026
Sustainable Trail Infrastructure for Sydenham Park